Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114
Ethiopia harnesses low-cost energy for Bitcoin mining from renewable sources – TON BOT

Ethiopia harnesses low-cost energy for Bitcoin mining from renewable sources

Ethiopia is emerging as a prominent Bitcoin mining hub, consuming 600 MW of power, with potential for significant capacity increases. Mid-generation machines are preferred due to their efficiency. Despite challenges like low electricity access for citizens, government support and projects aim to enhance digital infrastructure for mining activities.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *