Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-fail2ban domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6170
Keel exits U.S. Bitcoin mining after $65M loss, shifts to AI – TON BOT

Keel exits U.S. Bitcoin mining after $65M loss, shifts to AI

Keel Infrastructure has closed all U.S. Bitcoin mining operations to focus on artificial intelligence and high performance computing data centers. Q2 revenue dropped by 50% to $30 million, with a net loss of $65 million. The company sold 1,085 BTC for $75 million and plans to liquidate all Bitcoin holdings by 2026.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *