Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-fail2ban domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6170
Bitcoin miner IREN targets Europe AI cloud growth with Nostrum deal – TON BOT

Bitcoin miner IREN targets Europe AI cloud growth with Nostrum deal

IREN Limited acquired Nostrum Group, known as Nostrum Group, expanding its AI cloud capabilities in Europe. The deal adds 490MW in Spain and marks IREN’s entry into the European market. The acquisition aligns with a trend of Bitcoin miners shifting towards AI infrastructure to diversify revenue streams. Other miners, like HIVE Digital and Bitdeer, are also converting mining sites for AI and high-performance computing workloads.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *