Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-fail2ban domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6131
HIVE soars over 35% on plans for $2.55b Toronto AI ‘super factory’ – TON BOT

HIVE soars over 35% on plans for $2.55b Toronto AI ‘super factory’

HIVE Digital is transitioning from Bitcoin mining to building a CAD 3.5 billion, 320 MW AI infrastructure park near Toronto. The project aims to host over 100,000 GPUs and start operations in the second half of 2027. This pivot towards AI and high-performance computing has seen the company’s stock rise by over 35%.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *