Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-fail2ban domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wptelegram domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6131
Trump touts 1,600 new power plants as AI data demand strains ERCOT grid – TON BOT

Trump touts 1,600 new power plants as AI data demand strains ERCOT grid

President Trump announced plans to bring 1,600 new power plants online within a year to reduce electricity costs as part of his economic agenda. The surge in energy demand, especially from data centers for AI projects, is highlighted by ERCOT. Trump aims to boost economic growth and competitiveness through increased energy generation.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *